Nugent Aparments

In co-operation with Kalmar Construction, Conslab completed the Nugent Apartments floor preparation in November 2013.

Conslab’s scope was to carry out the floor preparation to the pre existing slabs prior to floor coverings being installed. This involved the filling of low spots and the grinding of high spots and an overlay to the services room.

Complexities were that the scope wasn’t obvious straight away and so initiative on Conslab’s part was taken to ensure that the working solution put forward met the flatness requirement of the floor coverings. Conslab worked with the main contractor to accommodate their tight program and deliver a flawless base.

 

View gallery

Still want more? Check out these case studies

Back to top