Countdown Manukau
Main Contractor: Haydn & Rollett
Constructed: 2009
Post Tensioning: BBR Contech
Concrete Supply: Allied Concrete Penrose
A 10,000m2 elevated post tensioned slab constructed by Conslab over 9 pours. Producing a seamless crack free for slab for Countdown Manukau with a light airy basement carpark.
Programme was able to be pushed forward through use of the post tensioned insitu slabs.