Countdown Manukau

Main Contractor: Haydn & Rollett

Constructed: 2009

Post Tensioning: BBR Contech

Concrete Supply: Allied Concrete Penrose

A 10,000m2 elevated post tensioned slab constructed by Conslab over 9 pours. Producing a seamless crack free for slab for Countdown Manukau with a light airy basement carpark.

Programme was able to be pushed forward through use of the post tensioned insitu slabs.