

Lincoln New World
Lincoln, Canterbury
Constructed: 2009
Main Contractor: Armitage Williams Ltd
The 1350m2, 130mm thick, mesh floor, was cast in strips with an inlaid brass strip running along and across the strips.
The floor was ground and polished by C2 Hard.
