Mitre 10 Petone, Wellington

Location: Petone

Client: Mitre 10

Completed: 2004

Main contractor: Armstrong Downes Construction

Post-tensioning: BBR Contech

Concrete: Allied Concrete

 

Mitre 10 often refers to this floor as one of its best.

 

Covering 10,400m2, the 150mm thick post-tensioned floor was installed in the company’s main retail and drive-through areas. Finished with Ashford Formula, it delivered the long-term gloss, surface hardening and dustproofing that Mitre 10 was looking for – a maintenance-free surface that will last for many decades to come.