Mitre 10 Petone

Petone, Wellington

Main Contractor: Armstrong Downes Construction

Constructed: 2004

10,400m2, 150mm thick, 40 MPa post tensioned floor. The floors to both the main retail and drive through were post tensioned. Finished with Ashford Formula to improve long term gloss this is often referred to by Mitre 10 as one of their best slabs.

1560m3 concrete supply by Allied Concrete in 4 large pours.

Post tensioning supply and installation by Contech BBR.