Aircraft Hangar, Nelson
Location: Nelson Airport
Client: Air New Zealand
Completed: 2010
Main contractor: Mainzeal Property & Construction
Post-tensioning: BBR Contech
Concrete: Allied Concrete
This 4630m2, 160mm thick, 40MPa post-tensioned concrete slab met the client’s specific requirement for a completely joint-free surface. As the work was completed ‘airside’, all 740m3of the concrete were poured via an office to one side. The slab was finished with Ashford Formula to harden, gloss and dustproof the surface, before being sealed with Ashford Seal Guard.