Toll, Saville Link
Saville Link Industrial Park, Auckland
Main Contractor: Haydn & Rollett
Date: 2005
Steel Fibre: Novocon
Concrete: Allied Concrete
A 13,880m2, 165mm thick, 35 MPa jointless steel fibre slab. Constructed in bays up to 40m long with no sawcuts with 40kg of Novocon 50mm fibre. Joints dowelled and armoured with double sided flats.
Ashford Formula was used to promote long term gloss and reduce dust after curing under polythene.
The 3000m2, 160mm thick canopy was also designed jointless with 40kg of Novocon steel fibre and a 35 MPa concrete.
There is also a 150mm thick yard constructed in steel fibre with sawn joints at 5m centres and armoured free joints at roughly 30m.