top of page
Construction Case Studies
Kiwirail RD35
This project involved removing 750m of rail track from two existing sidings at the Port of Tauranga, pouring two new slabs, and then replacing the track – all within ten!
Whenuapai Taxiway & Hardstand
Taxiway and hardstand reconstruction project at NZDF Base Whenuapai.
bottom of page