Flooring Projects
90 Pavillion Drive
This pair of new warehouses in Airport Oaks required high-performance floors to provide maximum flexibility for tenants and longevity for the owner.
Balance Reporoa
Fertilizer storage buildings are as tough as it gets for a concrete flooring contractor
Cardinal Logistics' Stage 1
Cardinal Logistics’ new Drury site is the country’s first fully automated facility
Kiwirail RD35
This project involved removing 750m of rail track from two existing sidings at the Port of Tauranga, pouring two new slabs, and then replacing the track – all within ten!
Woolworths Palmerston North
The new Woolworths Distribution Centre in Palmerston North is a mammoth building – at 38,000m2 it's large enough to fit more than five rugby fields!